Free Web Hosting by Netfirms
Web Hosting by Netfirms | Free Domain Names by Netfirms

 

 

HOME

HOURS

LOCATIONS and MAP

EMAIL US

ORDERING INFORMATION

SOIL PREPARATION

INSTALLATION

MAINTENANCE

SOD vs SEED

FAQ's

 

 

INSTALLATION

Sod should be installed as soon as possible after delivery.

bulletIn extremely hot weather, sod needs to be installed immediately.
bulletIn cooler temperatures, sod should be installed within 24 hours.
bulletBegin installing sod along a straight line, such as a driveway or property line.  Push edges and ends tightly against each other.  Avoid gaps and overlapping.  Stagger pieces in a brick like pattern to avoid long seams.
bulletPrior to watering, sod may be rolled with a half-filled roller.  This will improve sod to soil contact and remove any air pockets.
bulletApply at least 1" of water to sod immediately after installation.  The sod will take 10 - 14 days to firmly root to the soil.  Water twice a day during the rooting process and minimize walking on the sod.  Water should not be laying on the sod, but the roots should stay moist during this time.