|
HOME
HOURS
LOCATIONS and MAP
EMAIL US
ORDERING INFORMATION
SOIL PREPARATION
INSTALLATION
MAINTENANCE
SOD vs SEED
FAQ's
| |
INSTALLATION
Sod should be installed as soon as possible
after delivery.
 | In extremely hot weather, sod needs to be
installed immediately. |
 | In cooler temperatures, sod should be
installed within 24 hours. |
 | Begin installing sod along a straight line,
such as a driveway or property line. Push edges and ends tightly against
each other. Avoid gaps and overlapping. Stagger pieces in a brick
like pattern to avoid long seams. |
 | Prior to watering, sod may be rolled with a
half-filled roller. This will improve sod to soil contact and remove any
air pockets. |
 | Apply at least 1" of water to sod
immediately after installation. The sod will take 10 - 14 days to firmly
root to the soil. Water twice a day during the rooting process and
minimize walking on the sod. Water should not be laying on the sod, but
the roots should stay moist during this time. |
|